I currently source parts locally, but I decided to try RFQ work.com
1) Material type 6061 Aluminum
2) Is a material quote required or is material supplied. Material quote required
3) Quantity 10 (initially to see quality)
4) Drawings should be immediately available or necessary specs. Solid model also available if required
5) Required time frame 2 weeks
6) RFQ ending time 6/7/2009
Saw cut edges must be machined. Tolerance is .005 except where specified. Please let me know if I am missing anything as this is my first post.
I require this and other parts on a continual basis.
Best Regards,
Ron
1) Material type 6061 Aluminum
2) Is a material quote required or is material supplied. Material quote required
3) Quantity 10 (initially to see quality)
4) Drawings should be immediately available or necessary specs. Solid model also available if required
5) Required time frame 2 weeks
6) RFQ ending time 6/7/2009
Saw cut edges must be machined. Tolerance is .005 except where specified. Please let me know if I am missing anything as this is my first post.
I require this and other parts on a continual basis.
Best Regards,
Ron