Katana Man
Member
It's time for more of these parts. I'm looking for a fast turn around on this job. 1-2 weeks would be best. If anyone has available time to do these now, please give me a quote, thanks.
2 parts: left and right bulkheads
Material: Aluminum 6061
1/4" Aluminum sheet is required (not provided)
Quantity: 100 each part
Time frame: 2 weeks or less
Holes drilled and tapped for 4-40 threads
Tolerance: +- .005"
USA companies only please.
We've designed this in SolidWorks those files and can provide more dimensioned .pdf's if needed
2 parts: left and right bulkheads
Material: Aluminum 6061
1/4" Aluminum sheet is required (not provided)
Quantity: 100 each part
Time frame: 2 weeks or less
Holes drilled and tapped for 4-40 threads
Tolerance: +- .005"
USA companies only please.
We've designed this in SolidWorks those files and can provide more dimensioned .pdf's if needed