mklod
Member
Material is POM/acetal/delrin. You supply material. Prefer black.
Need at least 4 parts machined. Let me know what quantity makes sense given your material order.
Parts machined according to drawings. Please note that on each part, 11x8x30mm linear bushings will be pressed into the sides, and a ball screw lead screw will be pressed into the central hole. I will have my engineer designate tolerances for these three critical holes.
Need these parts machined over the next 10-14 days. Not in a mad rush but looking for about a one week turn.
Accepting quotes until end of week (15 Feb).
Please PM me with a quote and your email. I do have STP file available.
Feel free to ask any relevant questions on this thread.
Thanks,
Mike
Need at least 4 parts machined. Let me know what quantity makes sense given your material order.
Parts machined according to drawings. Please note that on each part, 11x8x30mm linear bushings will be pressed into the sides, and a ball screw lead screw will be pressed into the central hole. I will have my engineer designate tolerances for these three critical holes.
Need these parts machined over the next 10-14 days. Not in a mad rush but looking for about a one week turn.
Accepting quotes until end of week (15 Feb).
Please PM me with a quote and your email. I do have STP file available.
Feel free to ask any relevant questions on this thread.
Thanks,
Mike