[closed] 4-6pcs Machined Acetal Parts

Status
Not open for further replies.

mklod

Member
Material is POM/acetal/delrin. You supply material. Prefer black.

Need at least 4 parts machined. Let me know what quantity makes sense given your material order.

Parts machined according to drawings. Please note that on each part, 11x8x30mm linear bushings will be pressed into the sides, and a ball screw lead screw will be pressed into the central hole. I will have my engineer designate tolerances for these three critical holes.

Need these parts machined over the next 10-14 days. Not in a mad rush but looking for about a one week turn.

Accepting quotes until end of week (15 Feb).

Please PM me with a quote and your email. I do have STP file available.

Feel free to ask any relevant questions on this thread.

Thanks,

Mike
 

Attachments

  • carriage_pom_long_machined_r7.1.2.PNG
    468.9 KB · Views: 83

mklod

Member
PDF print available here
 

Attachments

  • carriage_pom_long_machined_r7.1.2 (1).PDF
    138.1 KB · Views: 50

robsys

New Member
Material is POM/acetal/delrin. You supply material. Prefer black.

Need at least 4 parts machined. Let me know what quantity makes sense given your material order.

Parts machined according to drawings. Please note that on each part, 11x8x30mm linear bushings will be pressed into the sides, and a ball screw lead screw will be pressed into the central hole. I will have my engineer designate tolerances for these three critical holes.

Need these parts machined over the next 10-14 days. Not in a mad rush but looking for about a one week turn.

Accepting quotes until end of week (15 Feb).

Please PM me with a quote and your email. I do have STP file available.

Feel free to ask any relevant questions on this thread.

Thanks,

Mike

Please send the STP file. RobinsonW@Tek4UFast.com. Tek4UFast has 20+ years of automation and machining experience. Please give us a look www.Tek4UFast.com
 

Joe alward

New Member
Material is POM/acetal/delrin. You supply material. Prefer black.

Need at least 4 parts machined. Let me know what quantity makes sense given your material order.

Parts machined according to drawings. Please note that on each part, 11x8x30mm linear bushings will be pressed into the sides, and a ball screw lead screw will be pressed into the central hole. I will have my engineer designate tolerances for these three critical holes.

Need these parts machined over the next 10-14 days. Not in a mad rush but looking for about a one week turn.

Accepting quotes until end of week (15 Feb).

Please PM me with a quote and your email. I do have STP file available.

Feel free to ask any relevant questions on this thread.

Thanks,

Mike
Please
Material is POM/acetal/delrin. You supply material. Prefer black.

Need at least 4 parts machined. Let me know what quantity makes sense given your material order.

Parts machined according to drawings. Please note that on each part, 11x8x30mm linear bushings will be pressed into the sides, and a ball screw lead screw will be pressed into the central hole. I will have my engineer designate tolerances for these three critical holes.

Need these parts machined over the next 10-14 days. Not in a mad rush but looking for about a one week turn.

Accepting quotes until end of week (15 Feb).

Please PM me with a quote and your email. I do have STP file available.

Feel free to ask any relevant questions on this thread.

Thanks,

Mike
I would like to quote send file to drachel8163@aol.com
 

Tristin Drury

New Member
Material is POM/acetal/delrin. You supply material. Prefer black.

Need at least 4 parts machined. Let me know what quantity makes sense given your material order.

Parts machined according to drawings. Please note that on each part, 11x8x30mm linear bushings will be pressed into the sides, and a ball screw lead screw will be pressed into the central hole. I will have my engineer designate tolerances for these three critical holes.

Need these parts machined over the next 10-14 days. Not in a mad rush but looking for about a one week turn.

Accepting quotes until end of week (15 Feb).

Please PM me with a quote and your email. I do have STP file available.

Feel free to ask any relevant questions on this thread.

Thanks,

Mike
Please send STP file to druryprecisionmachine@gmail.com I have the material in the supply warehouse.

website www.davidononline.com
 

alisa Lee147258

New Member
Material is POM/acetal/delrin. You supply material. Prefer black.

Need at least 4 parts machined. Let me know what quantity makes sense given your material order.

Parts machined according to drawings. Please note that on each part, 11x8x30mm linear bushings will be pressed into the sides, and a ball screw lead screw will be pressed into the central hole. I will have my engineer designate tolerances for these three critical holes.

Need these parts machined over the next 10-14 days. Not in a mad rush but looking for about a one week turn.

Accepting quotes until end of week (15 Feb).

Please PM me with a quote and your email. I do have STP file available.

Feel free to ask any relevant questions on this thread.

Thanks,

Mike
You can send to engineer07@top-rp.cn
 
Status
Not open for further replies.
Top