1) Material type - Delrin, black preferd but not a must
2) Is a material quote required or is material supplied. - Include material in quote
3) Quantity - 5
4) Drawings should be immediately available or necessary specs.- See file
5) Required time frame - 2 weeks from award of job.
6) RFQ ending time 6-17-10 or untill target price is met.
7) Please include in the quote shipping to zipcode 85249.
Other file formats avalible on request.
Thank you for yor time,
Kris
No quotes will be accecpted from: Contract_machining_inc, South Whitley, IN
2) Is a material quote required or is material supplied. - Include material in quote
3) Quantity - 5
4) Drawings should be immediately available or necessary specs.- See file
5) Required time frame - 2 weeks from award of job.
6) RFQ ending time 6-17-10 or untill target price is met.
7) Please include in the quote shipping to zipcode 85249.
Other file formats avalible on request.
Thank you for yor time,
Kris
No quotes will be accecpted from: Contract_machining_inc, South Whitley, IN
Attachments
Last edited: