rocketmaker
New Member
1) Stainless 316, 410 or similar
2) You supply material
3) 1 prototype piece to be made
4) Drawing attached- tolerances as shown. Critical dimension is diameter2. This will be a tight fit into another part. Other tolerances may be negotiable- mention in quote if necessary.
5) 2-3 weeks
6) RFQ ending time
If you need more specifics, please let me know. Drawing is attached to posting. Thanks,
Ed S.
2) You supply material
3) 1 prototype piece to be made
4) Drawing attached- tolerances as shown. Critical dimension is diameter2. This will be a tight fit into another part. Other tolerances may be negotiable- mention in quote if necessary.
5) 2-3 weeks
6) RFQ ending time
If you need more specifics, please let me know. Drawing is attached to posting. Thanks,
Ed S.