1) Material type - Mild Steel
2) Is a material quote required or is material supplied. - No material will be provided
3) Quantity - 1
4) Drawings should be immediately available or necessary specs. See post
5) Required time frame - 2 weeks from award
6) RFQ ending time 10 days or untill 7 quotes are submited
7) Make known any special treatments/finishes not necessarily related to the machining process. - If internal broaching is a problem please don't quote.
8) Please include shipping to zip 85249 in your quote.
Thanks for your time - Kris
2) Is a material quote required or is material supplied. - No material will be provided
3) Quantity - 1
4) Drawings should be immediately available or necessary specs. See post
5) Required time frame - 2 weeks from award
6) RFQ ending time 10 days or untill 7 quotes are submited
7) Make known any special treatments/finishes not necessarily related to the machining process. - If internal broaching is a problem please don't quote.
8) Please include shipping to zip 85249 in your quote.
Thanks for your time - Kris
Attachments
Last edited: