hello everyone i am new here and i bought a cnc mill but i have been swapped with work so here is a small job i need done there are 60 parts total 30 left and 30 right handed parts , the only thing that changes the "hand side" is the side hole and the side the 45 deg. groove comes from.
this is for a very big customer that checks parts 100% when i take them something so please dont try to "sneak it through "they will catch it. the mat. is copper i will need the parts no later than 2-16-07 please quote with delivery and you buying stock i can get the stock here a .5x.5x60 long for 97.00 if if you buy the 60" long bar run all the parts you can get from thr bar they will take 40 of each hand.. ok that is about it this customer pays me every 10 days i pay you when i get the parts and check them i do not do the 30 days to pay i know how tough that is
let me know
thanks
joe
this is for a very big customer that checks parts 100% when i take them something so please dont try to "sneak it through "they will catch it. the mat. is copper i will need the parts no later than 2-16-07 please quote with delivery and you buying stock i can get the stock here a .5x.5x60 long for 97.00 if if you buy the 60" long bar run all the parts you can get from thr bar they will take 40 of each hand.. ok that is about it this customer pays me every 10 days i pay you when i get the parts and check them i do not do the 30 days to pay i know how tough that is
let me know
thanks
joe