Katana Man
Member
Material: I'd love pricing for 7075 aluminum, stainless steel, and titanium
Material is required (not provided)
Quantity: 100
Time frame: 4 weeks
Tolerance: +- .005"
Pivot ball needs to be fairly smooth. Polishing may be needed.
Thank you.
Material is required (not provided)
Quantity: 100
Time frame: 4 weeks
Tolerance: +- .005"
Pivot ball needs to be fairly smooth. Polishing may be needed.
Thank you.
Attachments
Last edited: