Mitch_1979
New Member
Quotes welcomed for the turned part per attached drawing...
Qty: 4
Material: supplied by vendor
Shipped to: 95125
Requested timing: <2wks
RFQ closing date: Jan. 21
Please reply to this thread, or via PM.
Thanks,
-Mitch
[Edit @ January 17: Rev B of the drawing attached. Corrected material typo on the drawing. Any C3xx series brass is acceptable. Thanks to all for catching this.]
Qty: 4
Material: supplied by vendor
Shipped to: 95125
Requested timing: <2wks
RFQ closing date: Jan. 21
Please reply to this thread, or via PM.
Thanks,
-Mitch
[Edit @ January 17: Rev B of the drawing attached. Corrected material typo on the drawing. Any C3xx series brass is acceptable. Thanks to all for catching this.]
Attachments
Last edited: