MJonesEngineer
New Member
Need two quotes:
Material is 6061-T6 Aluminum and is not provided. Material should be part of the quote.
First quote for 6 parts total. (3 of each part type) These are prototypes and will be tested.
Second quote for 200 parts total. (100 of each part type) These will be the production parts for customers. There may be minor changes from the original prototyped parts.
Drawings are attached and are in a prototype phase. If there are any mistakes or ways to make the parts cheaper please don't hesitate to mention it.
First order of 6 parts are required by March 10th or ASAP. Second batch of 200 parts will be ordered 30-90 days after receipt of first prototype parts. This gives me time to test and make changes it needed.
RFQ process will end by Feb 17th end of day
Please include the Black anodizing, material and shipment to California area code 92107 in quote.
Thank you for your help,
Marshall
mjonesengineer@gmail.com
Material is 6061-T6 Aluminum and is not provided. Material should be part of the quote.
First quote for 6 parts total. (3 of each part type) These are prototypes and will be tested.
Second quote for 200 parts total. (100 of each part type) These will be the production parts for customers. There may be minor changes from the original prototyped parts.
Drawings are attached and are in a prototype phase. If there are any mistakes or ways to make the parts cheaper please don't hesitate to mention it.
First order of 6 parts are required by March 10th or ASAP. Second batch of 200 parts will be ordered 30-90 days after receipt of first prototype parts. This gives me time to test and make changes it needed.
RFQ process will end by Feb 17th end of day
Please include the Black anodizing, material and shipment to California area code 92107 in quote.
Thank you for your help,
Marshall
mjonesengineer@gmail.com