mklod
Member
Material will not be provided. Need 200 pcs of each part (2 separate parts). 3D files available upon request.
Ideally, these will be produced immediately and received by this Saturday. Quotes open until this Saturday (11/4).
Price/lead time to beat: $600 total; 13 days total including shipping (China). A higher cost but faster lead time is perfectly acceptable.
Note: we have been looking for a machining partner local to the SF Bay Area. If you are capable of quick-turn jobs, let's talk more.
Ideally, these will be produced immediately and received by this Saturday. Quotes open until this Saturday (11/4).
Price/lead time to beat: $600 total; 13 days total including shipping (China). A higher cost but faster lead time is perfectly acceptable.
Note: we have been looking for a machining partner local to the SF Bay Area. If you are capable of quick-turn jobs, let's talk more.