Material: Price needed for both quantities in both mild steel and 316 Stainless (314 in drawing is a typo)
Quote with labor + materials required
Qty: 6pcs and 60pcs
Time Frame: Delivery of goods to our offices in 2 weeks.
RFQ End: 2/25/09
Tolerance: .003
Contact Andrew, andrew@ardesign.info or 303 990 3612
Quote with labor + materials required
Qty: 6pcs and 60pcs
Time Frame: Delivery of goods to our offices in 2 weeks.
RFQ End: 2/25/09
Tolerance: .003
Contact Andrew, andrew@ardesign.info or 303 990 3612
Attachments
Last edited: