Search results

  1. R

    Triple Tree Covers

    This is a new item. I will make 15 to start, but could be more batches. I am pricing this local also. 1. 16 gauge steel 2. Vendor supplies material 3. 15 pieces 4. Drawings attached. 5. Lead time should be 2-3 weeks. Quicker is better. 6. RFQ Ending is 3/8/06 7. Part will be chromed...
  2. R

    Swing Arm Covers

    Note: This is also posted at cnczone.com. I need the following piece cut and shipped. I used a local shop to build 90 of these in three seperate batches. Quaility was good and lead time usually acceptable. I am checking prices here and will utilize a vendor if the price is right. 1...
Top